Skip to content

Spider-Man 2 Greenwich Spider-Bots and All 7 Collectibles

Greenwich has 7 collectibles in Marvel’s Spider-Man 2: 3 Spider-Bots, 2 Photo Ops, 1 Prowler Stash and 1 Marko’s Memory. The overview map shows all of them at once, and each location below comes with screenshots, starting with the Greenwich Spider-Bots.

Related Guides:
Upper East Side Spider-Bots and 100% Completion
Harlem Spider-Bots and 100% Completion
Upper West Side Spider-Bots and 100% Completion
Central Park Spider-Bots and 100% Completion
Midtown Spider-Bots and 100% Completion
Hell’s Kitchen Spider-Bots and 100% Completion
All Marko’s Memories
Astoria Spider-Bots and 100% Completion
Downtown Queens Spider-Bots and 100% Completion
Marvel’s Spider-Man 2 Game Guides Hub

All 7 Collectibles in Greenwich

Total: 7 collectibles – 3 Spider-Bots, 2 Photo Ops, 1 Prowler Stash, 1 Marko’s Memory


The in-game map with all 7 collectible symbols added. Click the map to open it in full size.

Greenwich collectibles map with all Spider-Bots, Photo Ops, the Prowler Stash and the Marko Memory in Spider-Man 2

There are 3 Spider-Bots in Greenwich. Spider-Man 2099 comes up in the main story, while Flipside and JJJ are hidden at the Modern Art Museum and on a Daily Bugle graffiti.

Flipside Spider-Bot

Location: Modern Art Museum in the northwest corner of Greenwich

Flipside sits at the entrance of the museum. It is tricky to spot, because it blends in with the building.

Flipside Spider-Bot at the entrance of the Modern Art Museum in Greenwich in Spider-Man 2

JJJ Spider-Bot

Location: Building in the center-north of Greenwich

The JJJ Spider-Bot crawls on top of a Daily Bugle graffiti on the side of the building.

JJJ Spider-Bot on the Daily Bugle graffiti on a building in Greenwich in Spider-Man 2

Spider-Man 2099 Spider-Bot

Location: Western side of Greenwich

This is the introductory Spider-Bot. Ganke leads you to it during the main story mission, so you pick it up as you play.

Spider-Man 2099 Spider-Bot location on the map in western Greenwich in Spider-Man 2

Location: Playground at street level in the center-west of Greenwich

Marko’s Memories show up as orange crystals on the map. On site, look for a cloud of sand. In Greenwich, it hangs over a playground that is covered in sand.

To get the crystal, you need to fight the Sandmen. For every other crystal in the game, see the complete Marko’s Memories guide.

Marko Memory crystal in the sand covered playground in Greenwich in Spider-Man 2

There are 2 Photo Ops in Greenwich, one in the center and one in the center-north. Take a picture of the person or scene to complete each one.

Telling Time Photo Op

Location: Near the park area in the center of Greenwich

A man standing on a box tells the time, so the ESU students are not late for class. Take a picture of him to complete the Photo Op.

Man standing on a box for the Telling Time Photo Op in Greenwich in Spider-Man 2

Greenwich Mural Photo Op

Location: Brick building in the center-north of Greenwich

Keep an eye out for a colorful graffiti painting on a brick building. Take a picture of the mural to complete the second Photo Op.

Colorful Greenwich Mural graffiti on a brick building for the Photo Op in Spider-Man 2

Location: Rooftop in the southwest corner of Greenwich
Character: Miles

The puzzle needs Miles and his Chain Lightning, so switch to him before you head to the rooftop.

Prowler Stash location on the map in the southwest corner of Greenwich in Spider-Man 2

How to Access the Prowler Stash

Scan the purple area with R3 and look for a big metal door. Hold L2 to uncover the Prowler code, then move both sticks into the highlighted area and hold them there until the code stabilizes.

Scanning the big metal door for the Prowler code on the rooftop in Greenwich in Spider-Man 2

The code highlights the spot where the metal wall needs to be yanked. Go to the corner where Miles can look down on the wall, like in the screenshot, and pull it towards you with L1+R1.

Miles in the corner above the metal wall to yank it open at the Prowler Stash in Greenwich in Spider-Man 2

How to Power Up the Door

With the metal wall gone, a door appears in its place. To open it, power up all four generators with Chain Lightning (L1+Square). All four are highlighted in the screenshot below.

The generators are on a timer, so act quickly before they reset. Start with the southern one, where Miles is standing in the screenshot.

All four generators highlighted for Chain Lightning at the Prowler Stash in Greenwich in Spider-Man 2

Collect the Prowler Stash

Enter the Prowler Stash room and open the purple safe on the wall. Inside are Rare Tech Parts for your Spider-Man upgrades.

Purple Prowler Stash safe on the wall inside the hidden room in Greenwich in Spider-Man 2
author avatar
Camzillasmom Collectibles Hunter
It all began in the ’80s when I was just 7 years old. Starting with basic arcade games, I soon delved into titles like Loom and Monkey Island by Lucasarts. Throughout the years, as I indulged in more and more games, I consistently sought clear guides to swiftly navigate my gameplay. Now, it’s my turn to contribute back to the community.

About Marvel’s Spider-Man 2

Release: October 20th, 2023
Developer: Insomniac Games
Publisher: Sony Interactive Entertainment
Official Website: https://insomniac.games/game/marvels-spider-man-2/